Home/Services/Project Cargo and Heavy Lift
Project

Project Cargo and Heavy Lift from Turkey

Out of Gauge · Heavy Lift · Break Bulk · Ro-Ro · Flat Rack · Route Survey · Special Permits
Quick quote

Request a quote for your shipment in one minute

Tell us your company, route and cargo — our team replies with a clear price.

  • 24 hReply within 24 working hours
  • B2BCommercial and corporate shipments only
  • FIATAAttended FIATA World Congress 2026, Milano
  • OneRoad, sea, air and customs from one partner
Message us on WhatsApp →

    Overview

    Out-of-gauge and heavy-lift shipments planned from the lifting point backwards: dimensions, permits, equipment and route surveyed before anything is booked.

    Project cargo is what happens when a shipment stops fitting the standard unit. Once a piece exceeds the internal dimensions of a container or the legal limits of a road vehicle, price stops being a rate per cubic metre and becomes a function of four things: the real dimensions, the weight and where it sits, the permits the route requires, and the equipment available on the day. We plan these shipments backwards — from how the piece will be set down at destination, not from how it leaves the factory.

    When a shipment becomes project cargo

    • It no longer fits. Above roughly 2.35 m internal width, 2.39 m height or 12 m length, a standard container is out and flat rack, open top or break bulk begins.
    • It is too heavy for the floor. A 20 ft container is payload-limited long before it is volume-limited; concentrated point loads can exceed what the floor or the chassis takes even when total weight looks acceptable.
    • The road has limits before the port does. In Türkiye, loads above 2.55 m width, 4.00 m height or 40 tonnes gross require a special transport permit from the General Directorate of Highways, and above certain thresholds escort vehicles as well.
    • It cannot be lifted conventionally. No certified lifting points, an off-centre centre of gravity, or a piece that must stay upright changes the crane, the spreader and the cost.

    The four numbers we ask for first

    What we need Why it decides the price
    Dimensions of each piece Length, width and height including skids, crating and any protruding part. A 30 cm overhang can move a shipment from flat rack to break bulk.
    Gross weight per piece Decides crane capacity, chassis type, axle configuration and whether the route needs a bridge assessment.
    Centre of gravity An off-centre load changes lashing, the lifting arrangement and sometimes the vessel. Marked on the piece by the manufacturer in most cases.
    Lifting and lashing points Certified points, or a statement that there are none. Without this the terminal will not plan the lift.

    If you can send a general arrangement drawing and a photo of the piece on its skids, most of this is answered in one message. Where the data is incomplete we say so rather than quoting a number that changes later.

    Modes and equipment

    Option Typical fit Watch out for
    Flat rack Pieces wider or taller than a box but still liftable by terminal gantry Out-of-gauge surcharges are charged on the slots the cargo blocks, not on the piece
    Open top Over-height pieces loaded from above Tarpaulin is weather cover, not protection; crating still matters
    Break bulk Pieces beyond any container envelope Sailing frequency is lower — the schedule, not the rate, usually drives the decision
    Ro-Ro Wheeled or trailer-mounted units, Türkiye to Italy and Spain Deck height and ramp limits decide feasibility before weight does
    Special road transport Europe and the Caucasus by low-bed, extendable or modular trailer Permits and escorts add days to the plan, not hours
    Air charter Time-critical replacement parts where downtime costs more than freight Door dimensions of the aircraft type govern, not floor area

    Permits and route survey

    On special road transport the permit is the schedule. A Turkish special transport permit is issued for a defined route, a defined vehicle configuration and a defined validity window — change any of the three and the permit is reissued. Where height or weight is close to a limit we run a route survey first: bridge clearances, overhead lines, roundabout radii and the final few hundred metres into the site, which is where most project shipments actually fail.

    We do not promise a permit timeline we cannot control. What we do commit to is telling you the realistic window before you commit to a delivery date, and flagging the points on the route that are likely to be the constraint.

    Customs on project shipments

    Oversized shipments are often inspected physically rather than documentarily, and an inspection on a piece that needs a crane to move is expensive. We handle customs clearance with the same team that plans the transport, so the classification, the values and the packing list are consistent before the truck or the vessel is booked. For shipments crossing Türkiye to a third country, the piece can move under transit without being imported at all.

    What we do

    Frequently asked questions

    What counts as project cargo?

    Any shipment that cannot travel as a standard containerised or full-truckload unit — because of its dimensions, its weight, its shape, or because it needs a special lift or a permit. There is no single threshold; the first piece of information that decides it is the dimension sheet.

    How long does a special transport permit take in Türkiye?

    It depends on the route and the configuration, and it is issued by the General Directorate of Highways, not by us. Straightforward routes are usually a matter of days; routes requiring bridge assessments or escort arrangements take longer. We give you the realistic window at quotation stage and update it as the application progresses.

    Can you quote from a drawing?

    Usually yes. A general arrangement drawing with dimensions, weights and lifting points is the fastest way to a firm number. Where the drawing is missing the centre of gravity or the lifting arrangement, we quote the transport and flag the lift as provisional rather than burying the risk in the price.

    Is flat rack always cheaper than break bulk?

    Not always. Out-of-gauge surcharges are charged on the container slots the cargo blocks on the vessel, so a piece that overhangs in two directions can cost more on flat rack than the same piece as break bulk. We compare both when the dimensions are near the boundary.

    Who is responsible for loading and lashing?

    Stowage and lashing on a vessel are performed to an approved plan under the carrier and terminal arrangements; on road movements the securing is the carrier’s responsibility to a documented method. We coordinate the plan and, where the cargo value justifies it, a marine warranty surveyor. Responsibilities are set out in writing before loading rather than assumed.

    Do you arrange cargo insurance?

    Yes, and on project shipments we recommend it without exception. Standard carrier liability is limited by weight and will not approach the replacement value of a piece of plant. Insurance is placed separately, with the sum insured based on the invoice value plus freight.

    Can the cargo wait if the site is not ready?

    Yes. The piece can be held in a bonded warehouse without being imported, which also defers import duty and VAT until the goods are actually released. For open-air pieces we arrange yard storage with appropriate protection.

    Do you handle the crane at destination?

    We coordinate it as part of the delivery where the site does not have its own lifting capability, working from the weight, the lifting points and the site access survey. On sites where the client’s contractor is performing the lift, we align the delivery window to their mobilisation instead.


    Send the dimension sheet, the weight per piece and the delivery address — with a drawing if you have one — and we will come back with a route, a mode and a cost, including the parts of the plan that are still open. Get in touch or request a quote.

    Price and quote

    What drives the price, and what we need for a quote

    What determines the price

    • Dimensions and weight: out-of-gauge cargo may need permits and escorts
    • Route survey: bridges, tunnels and road restrictions
    • Equipment: low-bed trailers, cranes, special lashing
    • Sea leg: break bulk, Ro-Ro or flat rack
    • Conditions at pickup and delivery sites

    What we need for a quote

    • Dimensioned drawing or packing list (length, width, height, weight)
    • Pickup and delivery points
    • Loading and unloading facilities
    • Target date
    • Packaging and lifting points, if any
    Send these details through the form and get a clear price within 24 working hours →
    Destinations

    Where we most often provide this service

    Other Services

    The whole operation, under one roof

    Road
    International Road Freight
    Reliable and flexible road freight solutions across Europe, Türkiye, the Caucasus, Central Asia and the Middle East.FTL · LTL · ADR · Project Cargo · Europe · Central Asia · Middle East
    Sea
    Sea Freight
    Connecting businesses worldwide with reliable and efficient sea freight solutions.FCL · LCL · Project Cargo · Door to Door · Customs Coordination
    Import
    DDP Import Solutions
    Where logistics ends, we carry on — managing the entire import process end to end, under a single responsibility.DDP · End-to-End Import · Customs · Duties Included · Door to Door
    Air
    Air Freight
    Fast and reliable air freight solutions worldwide for time-critical shipments.Air Cargo · Time Critical · High-Value Cargo · Express
    Customs
    Customs Clearance Services
    Complete handling of ATR, EUR.1, certificates of origin and T1 documents across import, export and transit operations.Import / Export · Transit · ATR · EUR.1 · Origin · T1 · Inspection
    Warehouse
    Warehousing Services
    Bonded warehousing, cross-docking and inventory management to store your cargo safely and plan its distribution.Temporary Storage · Bonded Warehouse · Cross Dock · Distribution · Inventory Management
    Consultancy
    Foreign Trade Consultancy
    From supplier sourcing to Incoterms advice and import/export planning, we structure your foreign trade from the ground up.Supplier Sourcing · Procurement · Import/Export Planning · Incoterms
    Transit
    Transit Freight
    Turning Türkiye's strategic position into your advantage — managing third-country transit shipments end to end, including T1 and transit regime procedures.T1 · Transit Regime · Third Country · Bonded Warehouse · Cross-Trade
    Quote

    Get a quote for this service

    Share your cargo details and we will come back shortly with a clear price.

    Get a quote on WhatsApp